11
ENGLISH
CAUTION
Please block the pipe knock outs of the front and side panels after
installing the pipes.
(Animals or foreign objects may be brought in to damage wires.)
!
Front Pipe
Draw Out
Right Side Pipe
Draw Out
Rear Side Pipe
Draw Out
Bottom Side Pipe
Draw Out
Refrigerant Pipe
Regulator
Nitrogen
Taping
Valve
Nitrogen
Direction
Nitrogen
Direction
Service Por
Leakage Prevention Cap
Liquid pipe
Refrigerant
Charging Port
Gas pipe
Pipe Knock Out for
Liquid/Gas pipes
Putty or insulating material
(produced locally)
<Gas pipe>
<Liquid pipe>
Wet towel
Method of drawing out pipes on the rear side
- Proceed with the pipe work as shown in the below figure for rear
side pie drawing out.
Pipe Knock Out for Liquid/Gas pipes
※Pictures may differ depending on the model.
Pipe Drawing Out during Single / Series connection
Method of drawing out pipes on the front side and right side
- Proceed with the pipe work as shown in the below figure for front
side and right side pipe drawing out.
Preparation Work
Remove leakage prevention cap
• Remove the leakage prevention cap attached to the outdoor unit
service valve before pipe work.
• Proceed the leakage prevention cap removal as follows:
- Verify whether the liquid/gas pipes are locked.
- Extract remaining refrigerant or air inside using the service port.
- Remove the leakage prevention cap
PIPE CONNECTIONS BETWEEN
INDOOR AND OUTDOOR UNIT
3, 4, 4.4, 5 Ton
- Pipe connections can be done on the front side or on the side accord-
ing to the installation environments.
- Be sure to let 0.2kgf/cm
2
(0.284lbs/in
2
) Nitrogen flow in the pipe when
welding.
- If Nitrogen was not flown during welding, many oxidized membranes
may form inside the pipe and disturb the normal operations of valves
and condensers.