ENGLISH
• Joints between branch and pipe should be sealed with the tape in-
cluded in each kit.
• Any cap pipe should be insulated using the insulator provided with
each kit and then taped as described above.
Insulator
Insulator of field pipe
Tape
Tape
Cap pipe
Insulator for cap pipe
Y branch pipe
Models Gas pipe Liquid pipe
ARBLN
01621
I.D19.05(3/4)
O.D15.88(5/8 )
I.D12.7(1/2)
I.D15.88(5/8)
I.D15.88(5/8)
I.D15.88(5/8)
I.D12.7(1/2)
I.D12.7(1/2)
292(11-1/2)
281(11-1/16)
74
(2-29/ 32)
70(2- 3 /4)
1
1
I.D12.7(1/2)
292(11-1/2)
281(11-1/16)
74
(2-29/ 32)
70(2- 3 /4)
I.D6.35(1/4)
I.D6.35(1/4)
I.D6.35(1/4)
I.D9.52(3 / 8 )
I.D9.52(3 / 8 )
I.D9.52(3 / 8 )
O.D9.52(3/8)
ARBLN
03321
1
2
3
3 1 2
I.D19.05(3/4)
I.D25.4(1)
I.D22.2(7/8)
I.D19.05(3/4) I.D12.7(1/2)I.D15.88(5/8)
83
(3-9 / 32)
I.D19.05(3/4)
I.D12.7
(1/2)
I.D15.88(5/8)
70(2- 3 /4)
O.D19.05(3/4) I.D22.2(7/8)
O.D25. 4(1)
I.D28.58(1-1/8 )
80(3-5/32)
I.D25.4(1)
110(4- 11/32)
O.D19.05(3/4)
I.D22.2(7/8)
413(16-1/4)
390(15-11/32)
I.D12.7(1/2)
I.D12.7(1/2)
I.D12.7(1/2)
74
(2-29/ 32)
332(13-1/16)
321(12-5/8)
I.D6.35(1/4)
I.D6.35(1/4)
I.D9.52(3 / 8 )
I.D9.52(3 / 8 )
I.D9.52(3 / 8 )
ARBLN
07121
2
3
1
2
1 3
I.D12.7
(1/2)
376(14-13/16)
404(15-29/32)
120(4-23/32) 120(4-23/32)
90(3-17/32)
I.D15.88(5/8)
I.D15.88(5/8)
I.D19.05(3/4)
I.D19.05(3/4)
O.D19.05(3/4)
96
(3-25/32)
I.D22.2(7/8)
I.D22.2(7/8)
O.D22.2
(7/8)
I.D34.9(1-3/ 8 )
I.D28.58(1-1/8 )
I.D28.58(1-1/8 )
I.D28.58(1-1/8 )
O.D31.8(1- 1/4)I.D31.8(1-1/4)
I.D31.8(1-1/4)
2
3
3 2
I.D15.88(5/8)
I.D15.88(5/8)
I.D15.88(5/8)I.D12.7(1/2)
I.D12.7(1/2)
I.D12.7(1/2)
O.D12.7(1/2)
O.D12.7(1/2)
70(2- 3 /4)
110(4- 11/32)
371(14-19 / 32)
394(15- 1/2)
83
(3-9 / 32)
I.D19.05(3/4)
I.D19.05(3/4)
I.D19.05(3/4)
I.D6.35(1/4)I.D9.52(3 / 8 ) I.D9.52(3 / 8 )
ARBLN
14521
2
3
3
3
2
2
3
471(18-17 /32)
517(20-11/32)
125
(4-29/32)
I.D41.3(1-5/8)
I.D38.1(1-1/2)
I.D38.1(1-1/2)
I.D22.2
(7/8)
I.D34.9(1-3/ 8 )
I.D34.9(1-3/ 8 )
I.D34.9
(1-3/8)
I.D28.58(1-1/8 )
I.D28.58(1-1/8 )
I.D15.88(5/8)
120(4-23/32)
I.D19.05(3/4)
O.D22.2
(7/8)
I.D41.3(1-5/8)
O.D38.1(1-1/2)
90(3-17/32)
130(5-1/ 8)
I.D41.3
(1-5/8)
I.D38.1(1-1/2)
O.D34.9(1- 3 / 8 )
I.D12.7(1/2)
I.D22.2(7/8)
O.D28.58(1- 1/ 8 )
70(2- 3 /4)
O.D15.88(5/8 )
120(4-23/32)
I.D19.05(3/4)
2
3
1
2 3 3
I.D15.88(5/8) I.D19.05(3/4)
I.D22.2(7/8)
I.D15.88(5/8)
I.D19.05(3/4)
I.D22.2(7/8)
I.D12.7
(1/2)
96
(3-25/32)
I.D15.88(5/8)
I.D19.05(3/4)
41616-3/8)
444(17-15/32)
I.D12.7(1/2)
O.D12.7(1/2)
O.D15.88(5/8 )
O.D19.05(3/4)
I.D22.2(7/8)
I.D6.35(1/4)
I.D9.52(3 / 8 )
I.D9.52(3 / 8 )
110(4- 11/32)110(4- 11/32) 80(3-5/32)
ARBLN
23220
115(4-17/32)
X2
100(3-15/16)
I.D12.7(1/2)
70(2-3/4)
120(4-23/32)
O.D.38.1(1-1/2)
I.D.34.9(1-3/8)
I.D.28.58(1-1/8)
O.D.28.58(1-1/8)
O.D.44.48(1-3/4)
X2
175(6-7/8)
I.D.53.98(2-1/4) I.D.25.4(1)
I.D.53.98(2-1/4) I.D41.3(1-5/8)
I.D41.3(1-5/8)
I.D38.1(1-1/2)
I.D38.1(1-1/2)
I.D.44.48(1-3/4)
I.D.44.48(1-3/4)
I.D.44.48(1-3/4)
420(16-17/32)
490(19-9/32)
134
(5-17/32)
1
2
3
32
3 3
3
3
2
I.D31.8(1-1/4)
O.D22.2(7/ 8)
I.D22.2(7/8)
I.D15.88(5/8)
O.D15.88(5/8 )
I.D19.05(3/4)
I.D12.7(1/2) O.D12.7(1/2) I.D6.35(1/4)
I.D9.52(3/8)
X2
110(4-11/32) 110(4-11/32)
I.D.25.4(1)
I.D.25.4(1)
I.D.25.4(1)
346(13-5/8)
379(14-29/32)
96
(3-25/32)
2
3 32
3
I.D22.2(7/8)
I.D22.2(7/8)
I.D22.2(7/8)
I.D15.88(5/8)
O.D19.05(3/4)
I.D19.05(3/4)
I.D19.05
(3/4)
[Unit:mm(inch)]
[Unit:mm(inch)]
Leak test
Leak test should be made by pressurizing nitrogen gas to 3.8
MPa(551.1psi). If the pressure does not drop for 24 hours, the system
passes the test. If the pressure drops, check where the nitrogen leaks.
For the test method, refer to the following figure. (Make a test with
the service valves closed. Be also sure to pressurize liquid pipe, gas
pipe and high/low pressure common pipe)
The test result can be judged good if the pressure has not be reduced
after leaving for about one day after completion of nitrogen gas pres-
surization.
Indoor unit
Nitrogen gas
cylinder
Slave 1 outdoor unit Master outdoor unit
Liquide pipe
Gas pipe
Liquide pipe
Gas pipe
Liquid side
Gas side
Close
Close
Close
Close
Header
Models Gas pipe Liquid pipe
4 branch
ARBL054
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
ID12.7(1/2)
ID15.88(5/8)
360(14-5/32)
120(4-23/32)
ID12.7(1/2)
ID15.88(5/8)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)ID19.05(3/4)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
ID9.52(3/8)
ID6.35(1/4)
360(14-5/32)
ID6.35(1/4)
120(4-23/32)
ID9.52(3/8)
ID9.52(3/8)ID12.7(1/2)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
7 branch
ARBL057
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
120(4-23/32)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)
540(21-1/4)
ID15.88(5/8)
ID12.7(1/2)
ID15.88(5/8)ID19.05(3/4)
ID12.7(1/2)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
120(4-23/32)
ID9.52(3/8)
ID9.52(3/8)ID12.7(1/2)
540(21-1/4)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
4 branch
ARBL104
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)
ID15.88(5/8)ID15.88(5/8)
ID12.7(1/2)ID12.7(1/2)
ID15.88(5/8)
ID12.7(1/2)
400(15-23/32)
160(6-5/16)
ID19.05(3/4)
ID22.2(7/8)ID28.58(1-1/8)
ID25.4(1)
150
(5-29/32)
120
(4-23/32)
ID9.52(3/8)ID9.52(3/8)
ID6.35(1/4)ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
360(14-5/32)
ID6.35(1/4)
120(4-23/32)
ID9.52(3/8)
ID9.52(3/8)ID12.7(1/2)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
7 branch
ARBL107
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)
ID15.88(5/8)
ID12.7(1/2)
160(6-5/16)
ID19.05(3/4)
ID22.2(7/8)ID28.58(1-1/8) ID25.4(1)
580(22-27/32)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
ID9.52(3/8)ID9.52(3/8)
ID6.35(1/4)ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
120(4-23/32)
ID9.52(3/8)
ID9.52(3/8)ID12.7(1/2)
700(27-9/16)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
10 branch
ARBL1010
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)
ID15.88(5/8)
ID12.7(1/2)
160(6-5/16)
ID19.05(3/4)
ID22.2(7/8)ID28.58(1-1/8) ID25.4(1)
760(29-28/32)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
ID9.52(3/8)
ID6.35(1/4)
120(4-23/32)
ID9.52(3/8) ID9.52(3/8)ID12.7(1/2)
ID6.35(1/4)
720(28-11/32)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
10 branch
ARBL2010
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID15.88(5/8)
ID12.7(1/2)
150
(5-29/32)
120
(4-23/32)
ID15.88(5/8)
ID15.88(5/8)
ID12.7(1/2)
ID19.05(3/4)
ID22.2(7/8)ID28.58(1-1/8) ID25.4(1)
775(30-17/32)
182(7-5/32)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
150
(5-29/32)
120
(4-23/32)
ID9.52(3/8)ID9.52(3/8)
ID6.35(1/4)ID6.35(1/4)
ID9.52(3/8)
ID6.35(1/4)
ID9.52(3/8) ID9.52(3/8)ID12.7(1/2)
ID6.35(1/4)
700(27-9/16)
60*9=540(21-1/2)
107(4-7/32)
ID15.88(5/8)
ID12.7(1/2)
• Header should be insulated with the insulator in each kit.
Insulate the header using
the insulation
material attached to the
branch pipe kit
as shown in the figure.
Leak Test and Vacuum drying
Zobrazit stránku 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 28 29

Komentáře k této Příručce

Žádné komentáře